As we wrote in our weekly brief, last week’s AI infrastructure sell-off was brutal. The iShares Semiconductor ETF (SOXX) fell c. 10.7% over 12-16 October. Our own portfolio lost c. 12.7%.[1] After a drawdown like that, we owe ourselves more than reassurance.
Our January Outlook, Part 2 argued that the buildout was genuine and its funding foundations were sound.[2] We have gone back through the supply chain to ask whether that second judgement still holds.
Demand remains strong. ASML Holding (ASML), which supplies chipmaking machines, said its planned capacity for 2027 and 2028 would fall short of customers’ requirements.
Taiwan Semiconductor Manufacturing Company (TSMC), the foundry producing many of the world’s most advanced chips, reported another strong quarter.[3][4] But Broadcom (AVGO) chief executive Hock Tan warned that capital could become AI’s biggest constraint.[5]
The cost of insuring against an Oracle (ORCL) default reached near 300 basis points, or three percentage points.[6] Needing another data centre does not settle how to pay for it.
That is why we follow the cash, rather than adding up announcements.
A supplier can collect payment for a chip and still carry an obligation to pay if the buyer defaults. NVIDIA (NVDA), for example, has a maximum customer lease-guarantee cap of $105bn, larger than its latest-quarter operating cash multiplied by four. Yet its shares fell less than Broadcom’s or Advanced Micro Devices’ (AMD).[7][1] The financial exposure matters; it does not explain every price move.
Our read is that the buildout’s demand case remains intact, but its financing is less secure than January’s verdict implied. Customers, outside investors and suppliers are carrying more of the construction bill. The credit scare has substance but as always, we believe it was over done as some of the most cash secure companies fell just as much as some of the more risky ones.
TLDR
The demand case holds; January’s financing reassurance needs revising. Meta’s new quarter no longer covered cash capex, leaving only Microsoft above that line among the five buyers.[8] That weakens quarterly self-funding, not the case for the entire buildout.
Customers are helping pay for construction. Oracle collected $11.4bn ahead of delivery, c. 49% of its $23.1bn quarterly operating cash; cash capex was still $28.5bn.[9] Those advances leave a service to deliver.
Profitable suppliers are also supporting their buyers. NVIDIA’s $105bn maximum lease-guarantee cap is c. 109% of annualised operating cash, with a separate $36bn cloud commitment.[7] That exposure matters even though its shares fell less than Broadcom’s or AMD’s.[1]
Headline cash is not always spendable cash. Alphabet’s $242.5bn cash/current-investment total includes $80bn of temporarily restricted SpaceX shares.[10] Supermicro used $6.8bn operating cash despite own-factory capex of only $162m.[11]
We stay invested, without adding. Foundry/equipment and selected memory/storage remain our joint funding preferences. We hold every position, make no purchases and retain c. 23.8% cash.[1] Funding strength does not make a share cheap at any price.
How to Read This Deep Dive
Section A explains the AI Bubble Test. Sections B-F follow the money from buyers to suppliers, assessing the relevant bubble warnings at each stop. Section G brings those findings together: was the credit scare justified, and what does it change for investors? Section H sets out what the next results must show.
Section A: The AI Bubble Tests
How the dot-com and housing crises informed our tests, what each asks and what would challenge January’s assessment.Section B: Hyperscalers, Labs and Operators
Operating-cash coverage, lab capital and the operators financing equipment orders.Section C: Chip Designers
Circular financing and the customer risk retained by profitable suppliers.Section D: Manufacturing and Equipment
Whether orders generate the cash to fund factories and tools.Section E: Memory and Storage
Operating receipts, customer deposits, venture funding and future obligations.Section F: Systems, Networking and Power
Inventory, customer-credit and installed-project financing risk.Section G: What the Tests Tell Us Now
The evidence against January, the sell-off and the investment implications.Section H: What the Next Results Must Show
The disclosures that would strengthen or weaken the funding case at each layer.
About This Series
This is Part 1: the funding map across the whole buildout. Five further chapters will investigate the individual layers as results arrive. Part numbers follow the supply chain; publication timing follows the evidence.
Section A: The AI Bubble Test
In January, we dissected the dot-com bubble of 1999-2000 and the housing crisis of 2006-2008 side by side to identify the warning signs common to both.[2][12]
Those common features became the six dimensions below: our anatomy of a bubble. We investigate them together to provide a complete picture.
Table 1: The January Bubble Tests We Are Revisiting
Source: Deep Edge Research, January Outlook Part 2.[2]
One change is already clear. On 16 September, the Federal Reserve raised its policy-rate range by 25 basis points to 3.75-4.00%.[13] January’s easing-rate cushion is no longer an assumption we can carry forward. The effect on a borrower depends on fixed or floating terms, credit spreads and when debt needs refinancing; one increase does not make every project unviable.
Following the Money
AI spending begins with the companies commissioning computing capacity. It then reaches chip designers, factories, memory makers and equipment suppliers, directly or through a cloud operator or server vendor. Figure 1 shows those routes; it is not an estimate of how much cash takes each path.
Figure 1: How AI Spending Reaches the Supply Chain
Source: Deep Edge Research. Procurement routes, not proportional cash flows.
Section B: Hyperscalers, Labs and Operators
Microsoft (MSFT), Alphabet (GOOGL), Amazon (AMZN), Meta Platforms (META) and Oracle generate substantial operating cash flow (OCF): the cash their businesses bring in after operating payments. Capital expenditure, or capex, pays for property, plant and equipment (PPE), including buildings and servers. Figure 2 asks how much cash remained after that investment bill. A negative bar means another source of funding was needed; coverage of 100% means operating cash exactly met the bill.
Figure 2: Buyer Cash Generation Versus Investment
Source: Company statements; Deep Edge Research.[14][8][9][10][15] Cash capex before lease principal; Amazon uses gross purchases. Group cash flows, not AI-only spending.
Only Microsoft covered its latest quarterly bill. Meta’s September results turned a $1.7bn June surplus into a $1.2bn shortfall; after finance-lease principal, free cash flow was −$2.1bn. That deserves attention, but it is not a funding failure: nine-month free cash flow remained +$11.1bn, with $82.5bn of cash, equivalents and marketable securities.[16][8] The immediate change is a thinner funding cushion.
A quarterly gap does not automatically mean new borrowing. Companies can use reserves, equity or customer receipts. Meta’s approved non-voting Class C share class opens a prospective equity route from January 2027; it is not money already raised.[8] Nor is every asset in a liquidity headline ready to spend: Alphabet’s $242.5bn total includes $80bn of temporarily restricted SpaceX shares.[10]
Customers are helping pay for construction
Oracle makes the funding dependence particularly clear. Customer prepayments of $11.4bn supplied 49.2% of quarterly operating cash, yet the quarter still left a $5.4bn capex gap. Its at-the-market share programme also raised $19.9bn net.[9] Customers and shareholders are helping fund construction before the resulting capacity earns its receipts. The next question is whether those receipts arrive in time to meet delivery and financing costs.
The specialist operators turn that issue into their business model. CoreWeave (CRWV), Nebius (NBIS), IREN, Applied Digital (APLD) and Hut 8 (HUT) build or operate capacity for customers. All five invested more than operations generated in their latest quarter.
Figure 3: Specialist Operators: Cash Left After Investment
Source: Company filings; Deep Edge Research.[17][18][19][20][21] June quarters except Applied Digital’s August quarter; company investment definitions differ.
Even IREN, with the smallest quarterly gap, had $13.6bn of capital commitments due within twelve months. June cash plus conditional finance covered c. 63.2%.[17] A small historical shortfall therefore does not settle the forward funding test. At IREN and Nebius, customer receipts paid ahead of delivery also contribute to operating cash; the chart is not a measure of cash earned only from services already delivered.
Outside capital has to become customer receipts
AI labs bring investors and lenders into the same chain. Amazon paid $50bn into OpenAI; OpenAI’s incremental $100bn Amazon Web Services (AWS) commitment is a future service purchase.[15][22] Those are linked transactions, not $150bn of independent funding. SoftBank funded its final $10bn OpenAI tranche from September bond proceeds: bond investors’ money becomes lab equity, then potential cloud receipts.[23]
Apollo Global Management (APO) and Blackstone’s (BX) Credit & Insurance business anchor Broadcom’s rack-financing platform.[24] Funds and their investors can supply capital while the listed manager earns fees. Guarantees can still leave obligations with the supplier. Figure 4 separates the funding arriving today from the service receipts that must eventually replenish it.
Figure 4: How Outside Capital Becomes Infrastructure Spending
Source: Deep Edge Research; Amazon/OpenAI, SoftBank and financing-platform disclosures.[15][22][23][24]
The chain works while finance and customer receipts keep arriving on the required terms. A delay can stop a project even when its customer wants the capacity. That is why strong demand is no longer enough to give buyers and builders a collective funding pass.
AI Bubble Test Verdict: infrastructure funding is less secure than January’s broad cash-funded description. Linked lab investments and cloud purchases also make circular financing a live question. Part 2 will examine how much of each builder’s forward bill is actually funded.
Section C: Chip Designers
Chip designers look straightforward to fund if we stop at their own capex. NVIDIA, Broadcom and AMD use manufacturing partners, and each generates enough operating cash to cover its own investment. But some of that financial strength also supports the customers buying their output. We call them supplier-underwriters when they take on that additional role.
Figure 5 shows the distinction: the bars are cash left after the company’s own investment; the figures alongside them measure disclosed customer support against annualised operating cash.
Figure 5: Chip Designers: Own Cash Generation and Customer Support
Source: Company filings; Deep Edge Research.[7][25][26][27] Latest fiscal quarters; before strategic investments and shareholder returns.
Our concern is that a chip sale can leave the seller with an obligation long after it has collected the revenue. NVIDIA’s guarantee supports an OpenAI affiliate’s leases with SB Energy affiliates. The first phase is expected in NVIDIA’s financial year 2029 and the leases run twenty years.[7] Default, release and recovery terms determine what NVIDIA might have to pay. Its separate $36bn AI-cloud service commitment, another 37% of annualised operating cash, remains a different obligation; we do not add it to the guarantee as though the two contracts were interchangeable.
The ratios show scale, not expected losses. They compare multi-year maximum support with the latest quarter’s operating cash multiplied by four: c. $96.3bn for NVIDIA, $56.8bn for Broadcom and $9.5bn for AMD. NVIDIA carries the largest disclosed support relative to that measure. Broadcom and AMD also retain customer exposure, but different legal terms prevent these ratios becoming a simple credit-risk ranking.[7][25][26]
For us, that changes what it means to own a profitable chip supplier. We are assessing both the cash generated by selling the product and the obligations accepted to help customers buy it. Strong own-capex coverage answers only the first question.
AI Bubble Test Verdict: supplier support is too large to dismiss as merely supplementary. It does not establish fictitious demand, but January’s reassurance on circular financing now requires a closer look at the contracts. Part 3 follows those obligations.
Section D: Manufacturing and Equipment
Further down the chain, much of the cash is staying with the companies building chips and supplying factory tools. TSMC converts chip orders into wafer and packaging revenue, then buys equipment and expands factories. In Q3 it generated NT$919.8bn operating cash against NT$443.2bn capex, leaving NT$476.6bn before dividends and other uses: 2.1 times coverage.[4]
Figure 6 shows why this layer matters to the funding argument. The foundry and toolmakers all covered their own investment. The packaging exceptions are visible alongside them.
Figure 6: Manufacturing, Equipment and Packaging: Cash Left After Capex
Source: Company statements; Deep Edge Research.[28][29][30][31][32][33][34] Period-average Federal Reserve exchange rates.[35] Periods differ; Amkor is a half-year, not a quarter.
We place more weight on cash that can repeat. ASML’s 28.5 times investment coverage was flattered by that €7bn working-capital inflow; Lam’s September ratio was 13.6 times, including capex and intangibles. Applied Materials, KLA and Tokyo Electron also covered their stated investment comfortably.[28][29][30][31][32] Packaging companies ASE and Amkor needed additional funding for expansion.[34][33]
The distinction matters if a customer’s project is delayed. A supplier with its own investment covered has more room to keep building without immediately seeking replacement finance. That does not protect its order book from a customer cancellation, but it separates the customer’s funding problem from an immediate inability to fund its own factory.
AI Bubble Test Verdict: this layer supplies counter-evidence to an industry-wide inability to finance capacity. Own-investment funding is strong at TSMC and the toolmakers, with identifiable packaging exceptions. Part 4 examines those differences.
Section E: Memory and Storage
The memory and storage suppliers also have cash behind their expansion. Micron Technology (MU), SK hynix (000660.KS) and Samsung Electronics (005930.KS) supply memory; SanDisk (SNDK) and Kioxia Holdings (285A.T) supply flash; Seagate Technology (STX) and Western Digital (WDC) supply hard drives.
Micron generated $89.7bn operating cash in its fiscal year ended 3 September against $30.7bn gross equipment spending, leaving $59bn before other uses.[36] That annual evidence sits behind our preference. Figure 7 compares the latest quarters, rather than mixing Micron’s full year with its peers’ quarterly figures.
Figure 7: Memory and Storage: Cash Left After Capex
Source: Company statements; Deep Edge Research.[37][36][38][39][40][41][42] Period-average Federal Reserve exchange rates.[35]
Those bars support the funding case, but the qualifications change the comparison. Samsung’s cash comes from the whole group. Removing all KRW10trn of SK hynix’s Q2 investment-dividend receipts still leaves KRW55.4trn operating cash against KRW10.7trn equipment spending, or 5.2 times coverage.[38] We do not need to guess who paid the dividend for that result to hold.
Micron’s customers also paid $12.7bn of deposits, recorded as financing rather than operating cash, and capex incentives added $3.3bn. Its own business covered investment before either contribution. The deposits still carry refunds, nearly all scheduled for 2029-31.[36] At SanDisk, funding its manufacturing ventures sits beside the company’s own capex bill. A very high own-capex ratio does not make those venture obligations disappear.[39]
Our read is that this is a materially stronger funding position than building capacity while waiting for the next financing round. We retain the obligations in our valuations, but the current factory bill is not dependent on new debt simply because the wider AI ecosystem is borrowing.
AI Bubble Test Verdict: operating cash supports current memory and storage investment. That helps protect our thesis from the funding scare; it does not settle what the shares are worth. Part 5 follows the deposits, venture funding and other claims on that cash.
Section F: Systems, Networking and Power
Funding a server business takes more than paying for its factory. It also takes cash to buy components, carry inventory and wait for customers to pay. Dell Technologies (DELL) and Hewlett Packard Enterprise (HPE) covered their investment 1.8 times over a quarter and 2.2 times over nine months, after customer finance and inventory absorbed cash.[43][44]
Super Micro Computer (SMCI) shows why the distinction matters. It used $6.8bn of operating cash in its June year despite own-factory capex of only $162m. Inventory absorbed $8.9bn and receivables $3.9bn; equity/hybrid offerings supplied $5.6bn. Its final quarter did produce positive $747m operating cash, but that improvement does not erase the year’s funding need.[11]
Figure 8 puts those businesses beside the network and power suppliers. Its period labels matter: the half-year and full-year bars are not quarterly figures scaled up.
Figure 8: Systems, Networking and Power: Cash Left After Investment
Source: Company statements; Deep Edge Research.[45][46][47][43][48][44][49][50][51][52][53][11] Periods differ; amounts are not annualised.
Arista’s funding strength holds even after we remove customer receipts paid ahead of delivery. Subtracting its $667m deferred-revenue contribution leaves c. $416m quarterly operating cash, c. 14 times its $30m equipment spending.[47] Marvell and our held interconnect names, Credo, Ciena and Lumentum, also covered their own-equipment investment after receivables and inventory absorbed cash.[50][53][49][51]
In power, those advances are more consequential. Removing the $13.7bn contract-liability contribution from GE Vernova’s half-year operating cash leaves negative $3bn, before investment. The equivalent subtraction leaves Vertiv negative $72m for the quarter; Bloom retains $15m against $52m equipment spending.[45][48][52] This is a test of dependence, not a forecast that customers will stop paying ahead. Eaton covered its half-year organic capex 3.7 times.[46]
Customer advances are evidence of commitment, but they also leave equipment to deliver and costs to pay. We therefore distinguish cash earned from completed work from cash received to fund work still ahead. The second can be a sound funding model; it needs a closer check on delivery costs and contract terms.
AI Bubble Test Verdict: strong orders coexist with working-capital and advance dependence. Own-capex coverage is reassuring only after we understand how the operating cash was generated. Part 6 follows that conversion.
Section G: What the Tests Tell Us Now
The six bubble tests, after following the money
Demand signal: the evidence still supports a buildout. ASML’s capacity commentary, TSMC’s results and supplier collections show customers seeking and paying for output. Those receipts do not establish that every end customer’s project earns enough to service its funding.
Circular financing: we can no longer assume it is merely supplementary. Withdrawing support would constrain particular projects, without the evidence establishing a collapse of wider demand.
Rate environment: the cushion has weakened. September’s increase removes the assumption that policy is easing into the buildout.[13]
Valuations: real earnings remain, but the price test is not cleared. We have not refreshed current multiples in this funding study, so neither real earnings nor last week’s lower prices gives an automatic pass.
Infrastructure funding: the cash-funded protection is less uniform. The warning is greater funding dependence in parts of the chain, not a measured industry-wide debt share.
Constraint cited: compute is still scarce, but capital is becoming a constraint too. ASML’s account of capacity falling short of customer requirements supports the compute-shortage side of January’s comparison.[3] Hock Tan’s warning introduces a different limit: the money to fund the next expansion.[5] Neither says the industry needs to manufacture more customers. Our read is that genuine demand is meeting a harder financing constraint, rather than the evidence showing the historical pattern of unwanted capacity awaiting buyers. That distinction would weaken if funding pressure began leaving suppliers with uncollected bills and idle capacity.
Did last week’s selling fit those findings?
We can now put the cash evidence beside what happened to the shares. Table 2 ranks the groups by their average fall, biggest first. Returns are equally weighted within each group, including Hut 8 among the operators. Financing platforms include Apollo, Blackstone, Ares Management (ARES), Brookfield Asset Management (BAM) and Blue Owl Capital (OWL). The final column uses the funding information available during the sell-off; Meta’s subsequent results update today’s map separately.
Table 2: The Sell-Off Through the Funding Map
Source: Deep Edge Research.[1] Equal-weight returns, 12-16 October, Monday US open to Friday close. Covering means operating cash met own investment, not all funding needs; reporting periods differ. Counts use information available then. Meta’s 21 October results reduced buyers to 1 of 5.[16][8] Three power companies cover only with customer advances.
Operators fell c. 8 percentage points more than memory/storage, and c. 10 more than foundry/equipment. No operator covered its own investment, and the group fell c. 23%. Supermicro, the systems supplier that did not cover, sits in the worst-hit group. Those falls line up with identifiable funding exposure.
But the rest do not follow a simple cash-coverage ranking. Buyers covered 2 of 5 on information available then yet fell least; memory and storage covered 4 of 4 yet still fell c. 14.9%. Systems fell c. 23% even though 2 of 3 covered. Their funding risk includes working capital, which an own-capex count cannot summarise.
NVIDIA brings us back to the opening. Its disclosed customer-support cap is largest relative to annualised OCF, yet it fell c. 6.4%, less than Broadcom’s c. 8.5% or AMD’s c. 11.9%.[1] We judge earnings, price and guarantee terms together; maximum exposure alone cannot explain that ordering.
Our read is that funding fears were a meaningful part of a broader repricing. Oracle’s widening credit spread showed creditor concern, while construction-dependent operators and working-capital-heavy systems suppliers suffered the larger falls. That fits the vulnerabilities our tests identify and warrants reassessment. Competition, earnings risk and starting prices still determine whether the size of each fall was justified.
Memory and storage fell more than the supplier-underwriters despite covering their current investment bills. That is where we see a reason to revisit earnings and price.
Section H: What the Next Results Must Show
Each check prompts a review, not an automatic trade. Reports are fiscal periods, not release dates.
Hyperscaler coverage. Meta’s September quarter has already breached this condition: cash after capex and finance-lease principal was −$2.1bn.[8] The quarterly cushion has narrowed, though positive nine-month free cash flow and substantial liquidity provide a buffer. Still to report: Microsoft’s September quarter on the same test, and Alphabet and Amazon, where another quarter of OCF below cash capex would extend the pattern. Evidence: September-quarter statements.
Oracle’s advance reliance. Customer advances exceeding 49.2% of positive OCF, or OCF at or below zero. Evidence: November-quarter 10-Q.
Nebius coverage by 25 October. Committed resources matched against twelve-month delivery and repayment obligations; a shortfall or unresolved coverage triggers our published position-size judgement.[20] Evidence: our W42 commitment.
Memory and storage cash. Micron, SK hynix or Samsung OCF falling below PPE after investment dividends, or Micron’s deposit refunds moving before 2029. Evidence: Micron fiscal Q1; SK hynix and Samsung September statements.
Power advance dependence. Vertiv’s deferred-revenue cash contribution at or below zero, or Bloom’s OCF less its deposit/deferred contribution remaining below PPE. Evidence: September-quarter cash flows and delivery costs.
Supplier-underwriter exposure. A guarantee ratio above the 43%, 51% and 109% baselines at AMD, Broadcom and NVIDIA. Evidence: AMD September, Broadcom November and NVIDIA October commitment notes.
The layer chapters will test these conditions against the next filings.
Bottom Line
Last week’s c. 12.7% portfolio loss gave us a reason to challenge January’s verdict.[1] Our answer is less comfortable: demand still supports the buildout, but its financing protections have weakened. Buyers investing ahead of receipts, operators relying on timely finance and suppliers retaining customer risk give the credit scare substance. September’s rate increase removes another cushion.
Cash-rich suppliers can remain profitable while projects elsewhere in the same chain struggle to finance construction. That combination does not establish an industry-wide bubble, or make every fall deserved. It does mean real demand can no longer carry the reassurance we took from it in January.
We therefore retain the book, make no new purchases and keep c. 23.8% cash. Foundry/equipment and selected memory/storage remain our joint funding preferences, subject to valuation. If financing stress spreads into their collections and investment, it will have reached the part of the thesis that currently gives us protection.
This is Part 1 of our six-part funding series. Next: Part 2, Hyperscalers, Labs and Operators. Meta’s quarterly cash cushion has already disappeared. We will use the next Microsoft, Alphabet and Amazon results to test how much of the next construction bill operations can fund, what depends on outside capital, and whether lab commitments become cash receipts in time. The later chapters follow that money through the supplier layers as their results arrive. Nebius’s 25 October funding judgement remains separate; it will not wait for Part 2.
References
Deep Edge Research: verified W42 price observations and reconciled portfolio returns, 12-16 October 2026, retained internally. Returns use Monday US open to Friday close. The 36-name comparison extends the retained observations with bounded historical endpoints on the same basis; calculations, membership and source custody are retained alongside this article. Funding interpretation is separate from measured price returns.
Deep Edge Research: 2026 Outlook, AI Infrastructure Is Not a Bubble, Part 2, 27 January 2026. January’s bubble anatomy and stress tests; the historical assessment, not a fresh industry funding estimate.
TSMC: Q3 results, 15 October; Q3 cash-flow presentation, slide 8.
Reuters: Oracle CDS near 300 basis points, updated 15 October. An attributed credit-market observation; separate from causal attribution of share-price returns.
NVIDIA July 10-Q, commitments, investments and Note 10 guarantees.
Meta, 21 October: September-quarter SEC exhibit; issuer release, cash-flow reconciliation and approved Class C share class. Released after the baseline date. The share class is a prospective financing route, not a completed cash raising.
Alphabet: June 10-Q, cash flows and Notes 3/4/5/6/11; Q2/TTM reconciliation.
Historical background: Couper, Hejkal and Wolman, Boom and Bust in Telecommunications, Federal Reserve Bank of Richmond Economic Quarterly, Fall 2003; Financial Crisis Inquiry Commission, conclusions, January 2011. Primary historical evidence on telecom overinvestment despite growing internet use, and excessive borrowing and failures of financial risk management in the housing crisis. The six-dimension bubble anatomy is Deep Edge Research’s comparison, not a test prescribed by either source.
Federal Reserve: FOMC statement, 16 September 2026. The target range rose by 25 basis points to 3.75-4.00%; borrower effects depend on contract terms and refinancing dates.
Hut 8 June 10-Q, restricted cash and project financing. Consolidated scope includes American Bitcoin; restricted project cash is separate from general liquidity.
Nebius Q2/H1 financial statements. The 25 October funding judgement is Deep Edge Research’s retained W42 commitment, not company guidance.
OpenAI/Amazon partnership and incremental AWS commitment. Amazon’s June filing [15] records $28.7bn invested by June and the subsequent $21.3bn payment.
SoftBank: final OpenAI tranche and bridge repayment, 1 October.
Lam Research September-quarter results, 21 October 2026. Released after the 18 October evidence date; capital expenditures and intangible assets combined, as in the June quarter.
Federal Reserve H.10 foreign-exchange data. Displayed amounts are rounded; calculations use unrounded inputs. Dollar chart conversions use the mean daily rate for each company’s reporting period; retained input series and calculations accompany the chart ledger.
Micron FY2026 10-K, cash flows and Notes 10/16; Q4/FY release.
Samsung: H1 consolidated statements; Q1 inputs.
SK hynix: H1 statements; Q1 inputs; readable copy of the H1 filing, consolidated cash flows and Note 24.
SanDisk: FY2026 filing, ventures and customer liabilities; Q4/FY cash flows.
HPE: July-quarter cash reconciliation; customer-finance presentation.
Arista: Q2 cash-flow statement; Q1 derivation input.
Ciena August 10-Q, cash flows and debt notes. Cash-flow row is nine months ended 1 August; source amounts in US$ thousands.
Marvell: August-quarter statements; quarterly filing; Google warrant terms.
Lumentum FY2026 10-K, consolidated cash flows and liquidity discussion. Year ended 27 June; source amounts in US$ millions; PPE is gross of asset-sale receipts.
Credo August 10-Q, cash flows and acquisition/liquidity notes. Quarter ended 1 August; source amounts in US$ thousands.
For informational purposes only. Not investment advice. Funding comparisons are distinct from current-price recommendations.