Below is a copy of the investment letter we sent to our clients.
Due to the depth and length of our original analysis, this note has been adapted for Substack; it has been divided into three parts for readability.
This is Part 3 of 3. For the full context, we recommend reading Part 1 and Part 2 first.
For informational purposes only. Not investment advice.
TLDR
We believe AI infrastructure is entering a supercycle: a multi-year buildout where bottlenecks migrate and benefits cascade across the system, not a single-ticker “GPU trade”
We organise the 2026 buildout into three arenas: Ship (the memory stack: HBM + packaging + storage), Energise (power + thermal), Utilise (interconnect)
Ship remains a near-term bottleneck through 2026, but the risk/reward begins to shift from pure scarcity to volume
Energise is the most underappreciated arena for 2026: time-to-power on time and liquid cooling are becoming gating constraints with multi-year lead times
Key risk: efficiency gains that reduce compute-per-dollar (rather than redirecting spend via Jevons Paradox). We outline the 2026 signposts we’ll watch to validate or falsify the thesis
Recap: What we established in Parts 1 and 2
In Part 1, we laid out the causal chain driving AI infrastructure demand.
Key findings: Training requires 4-5× more compute annually to stay competitive. Inference has shifted structurally with reasoning models and agentic workflows compounding token usage. Demand is outstripping supply: management language is “we need more compute,” not “we need more customers.” Hyperscalers are tracking at or above 2025 capex guidance, with run-rates suggesting $440-450B for the year. Monetisation is materialising with 130× token growth and 30%+ cloud revenue growth….all whilst limited by supply.
In Part 2, we stress-tested the bubble thesis using the anatomy of bubbles (the engine, the fuel, the amplifier, and the outcome):
The engine (demand): Growth is accelerating, not decelerating. The constraint is supply, not demand. OpenAI grew c. 20× in just over two years; Anthropic c. 9× in twelve months — this is not companies struggling to find customers
The fuel (financial engineering): Circular financing exists, but it is not foundational. The primary builders (hyperscalers) are funding the buildout from operating cash flow, not financial engineering
The amplifier (financial conditions): This is not tightening into fragile balance sheets the way 2000/2007 did — which changes how stress propagates
The outcome (valuations): AI capex is c. 1% of GDP (vs c. 6% for housing in 2005). Top tech is elevated but grounded in real earnings (a different set-up from dotcom-era extremes)
Conclusion: The structural conditions for a bubble aren’t present. This is a capital-intensive buildout driven by real demand. Posts 1 and 2 were largely scene-setting. This post is where the rubber hits the road: if we are not in an AI bubble but are in a genuine buildout, where are the asymmetric opportunities?
3) We are entering a supercycle in AI infrastructure investing
The phrase supercycle is often used loosely or as a buzzword.
That is not what we are doing here; we are using the word deliberately: a supercycle is fundamentally distinct from a standard business cycle and it is important to understand the distinction in order to anticipate what is to come.
A typical semiconductor business cycle is inventory led:
Companies buy too much inventory, they sell it down until demand normalises, they recover. This is the standard cycle
A supercycle is structurally different:
It is a multi-year cycle where demand is so sustained that it fundamentally changes the structure and nature of the supply chain
The key characteristic of supercycle is that due to high demand, bottlenecks appear; however, when you solve them, they do not just disappear, they migrate to the next binding constraint (see more below on binding constraints)
That rolling sequence of constraints is what elongates a standard cycle into a supercycle, and it is why the opportunity set broadens and rotates over time
How do we know this?
Because, as we mentioned in Part 1, the common mistake many investors and analysts make when thinking about AI is to treat “AI beneficiaries” on a ticker-by-ticker basis rather than seeing what AI infrastructure actually is: a system of inter-related parts.
This is where our approach is different. We use systems-level thinking to develop a holistic view of the causal relationships, patterns, and dynamics of the AI infrastructure landscape. This allows us to (a) anticipate where constraints will bind next (and therefore where profits will pool) and (b) spot mispricings and asymmetric opportunities across the system.
This is how we anticipated early in 2025 that HBM and CoWoS packaging would become binding constraints for the AI infrastructure buildout, forcing spend into the memory supply chain. This thesis played out nicely and the market has since caught up to that reality.
As we look at 2026 and 2027, many of the data centres that were being built over the last few years are going to be coming online at scale (>1GW): this means training and inference loads will increase, and as we discussed in Part 1, this will increase capacity constraints and migrate bottlenecks across the entire AI infrastructure landscape.
Figure 6: Gigawatt-scale data centre buildout speeds
Source: EPOCH AI. (illustrative; not equivalent to fully deployed compute).
This is why we say AI infrastructure is now entering a supercycle: a multi-year buildout where bottlenecks migrate and benefits cascade across the system, rather than remaining confined to a single-ticker layer (the 2022–2025 “GPU trade”).
Conclusion: The AI trade is no longer just “more compute (i.e., more GPU accelerators)”. As inference becomes a real workload driver, especially with retrieval-augmented generation (RAG) and longer-running agentic workflows, the system hits capacity limits and constraints bind: First the memory stack and storage (Ship), then power and thermal (Energise), then interconnect across larger clusters (Utilise). The key phrase here is “capacity constraints bind.” But where do they bind? …Because they do not bind uniformly. Constraints cascade through the system and the bottleneck shifts as each layer scales. Knowing where the constraint sits today, and where it migrates next, is how you identify who captures the economics of the buildout, not just who participates.
The systems-level framework we use to understand the AI infrastructure landscape
The framework we use to understand the AI infrastructure landscape is divided into three infrastructure arenas. Each represents a different stage in the physical delivery of AI compute:
Ship → Energise → Utilise
Figure 7: AI Infrastructure investment framework
Source: Deep Edge Research AI Infrastructure Framework
Ship answers: can we physically deliver balanced GPU system? (The memory stack: HBM + packaging + storage)
Energise answers: can we power and cool what we’ve built? (Power infrastructure + thermal management)
Utilise answers: can thousands of GPUs behave as one machine? (Interconnect + networking fabric)
These aren’t arbitrary categories. They follow the physical sequence of how AI infrastructure gets deployed: you ship the components, you connect them to power and cooling, then you connect them to each other. Constraints in any layer limit throughput for the entire system.
Conclusion: Exposure to the buildout is not the same as capturing the economics. The companies that benefit most won’t just be “in the AI supply chain” — they’ll be the ones with constrained capacity, pricing power, and defensible positions
Our specific call for 2026
The 2026 question is not whether hyperscalers will spend. It is where that spend is forced as constraints migrate through the system, and how quickly it can translate into usable throughput.
The language from management is unambiguous: build programmes are stepping up. Across the major hyperscalers, the common thread is “capacity build” — not “optimise,” not “pause”; that is why we forecast capex spend in 2026 to be c.$600B (up 36% year-over-year) (see Part 1).
These aren’t hedge-your-bets numbers. They’re execution commitments, and they imply that downstream demand for Ship, Energise, and Utilise components is not optional if the buildout is to come online on schedule.
When we look at where hyperscalers are spending that capex, approximately 75% of that spend is AI infrastructure, with 15% going to traditional cloud and 10% to other elements such as real estate.
Table 9: Hyperscaler 2026 Capex by Category
Source: CreditSights. “Technology: Hyperscaler Capex 2026 Estimates.” 2025.
When we then look at that c. $450B AI infrastructure bucket, we estimate that the two largest capex lines are GPUs/accelerators (c. $180B) and data centre construction (c. $120B). Together, they represent c. two-thirds of AI infrastructure spend. Networking, memory, cooling and power represent the other third.
That alone tells you the trade is broadening: to get usable GPU-hours, you have to fund the physical system around the chip, and as constraints migrate, spend is forced into Ship, Energise, and Utilise.
Table 10: Where the 2026 Capex Goes
Source: Deep Edge Research estimates, triangulated from Fusion Worldwide with estimates informed by vendor disclosures and industry checks.
Conclusion: 2026 is shaping up as a forced-spend year: hyperscalers are committed, and as constraints migrate the capex broadens across Ship, Energise, and Utilise. That is where market dislocations form and where we look for asymmetric opportunities.
A. Ship: memory and packaging are the near-term bottleneck
As we have already mentioned, in the causal chain, the first arena is Ship: can we physically deliver a balanced GPU system?
Where it sits in the causal chain: This is where useful throughput, not peak FLOP/s, becomes the constraint. If the accelerator can’t pull data fast enough, the extra compute is stranded, and stranded FLOPs translate directly into opportunity cost and lost revenue. The practical implication is that the system is forced to spend on the memory stack that keeps the chip fed (HBM + packaging on the hot path first, then storage tiers as inference and RAG scale).
The investment question: When memory becomes half the GPU bill of materials, who captures that margin shift?
GPUs are only as useful as the memory bandwidth that feeds them. Right now, HBM and advanced packaging are the gating factors for how close deployed accelerators can run to theoretical peak, and therefore how much of the installed FLOP base is realised versus stranded.
But as we highlighted in Part 1, inference is increasingly becoming the workload driver, and AI is not just “more compute”; It is more memory and more storage — especially as retrieval-augmented generation (RAG) and long-running agentic workflows make “context” and “corpus” first-class infrastructure.
So in Ship, it helps to think about the memory stack in three tiers:
Tier A (hot path): HBM + advanced packaging. This is your fast memory and gates shippable GPU accelerator systems at frontier performance.
Tier B (context path): host DRAM tiering + NVMe / enterprise SSD. This becomes increasingly important as context windows grow and RAG becomes default.
Tier C (corpus path): bulk storage (often HDD). Datasets, checkpoints, logs, and archives that continue to compound as usage scales.
The table below shows the HBM evolution. The key row is HBM4 (12-Hi) — that’s the current ramp, and where supply is tightest. Each generation roughly doubles bandwidth, but production can’t scale as fast as demand.
Table 11: HBM Evolution
Source: SK hynix, Samsung, Micron (company materials and product roadmaps, 2025–2026)
Those numbers define the ceiling on how much useful work your GPU can actually do, and right now, that ceiling is binding. As it is often very difficult to understand what these numbers mean, to put things into context, the current 1.2TB/s per stack bandwidth is the equivalent of passing the whole library of congress through HBM per second. That’s a lot of data.
The cost shift is equally striking: HBM now accounts for roughly half of GPU production costs, up from about a quarter just two generations ago. When memory represents half your bill of materials, the memory supplier isn’t a commodity — it’s a strategic partner, and crucially, this means players have pricing power and so profits pool and margins expand, as we are currently seeing with the key HBM players.
Why this matters for 2026: Memory suppliers and advanced packaging providers are running at or near full utilisation. Demand visibility is strong. The companies positioned here aren’t selling into hope — they’re selling into backlog.
Timing view: We expect memory constraints to continue throughout 2026 even as new HBM4 capacity ramps and CoWoS packaging bottlenecks loosen. Significant opportunity will remain in this arena; the only difference from our position last year is that the risk/reward profile will begin to shift from “constrained supply” to “volume growth.”
What we’ll cover this year: We’ll go into further detail when we publish our “Ship” Investment Memo. As always, we’ll break down the HBM competitive landscape, packaging capacity dynamics, and where we see the most attractive risk/reward.
Conclusion: Ship is the first gate in the supercycle: if the memory stack can’t keep accelerators fed, a meaningful share of compute stays stranded (known as stranded FLOPS). We expect this constraint to remain binding through 2026, with the opportunity shifting from scarcity to volume.
B. Energise: power and cooling are the emerging constraint
The second arena is Energise: can we power and cool what we’ve built?
Where it sits in the causal chain: This is where “capacity constraints bind” becomes physical, not as “megawatts on paper,” but as deliverable power at density. If any one input (grid connection, electrical gear, cooling, commissioning, permits) is missing, the contracted MW is stranded and the capex is unproductive, and you can end up with chips and racks you can’t plug in.
The investment question: Who can deliver time-to-power on time, not just equipment, but the ability to bring capacity online when hyperscalers need it?
This is the arena that’s moving from background issue to front-page constraint.
“The biggest issue we are now having is not a compute glut, but it’s power — the ability to get builds done fast enough close to power. You may actually have a bunch of chips sitting in inventory that I can’t plug in. That is my problem today.”
Satya Nadella (CEO, Microsoft)
Power is now a binding constraint because AI data centres have energy requirements that are >10x that of a traditional data centre. Take NVIDIA’s current GB300 NVL72 (Blackwell Ultra), for example, requires 120-130kW+ per rack. That is the equivalent energy consumption as 80-100 average American homes in a rack the size of a vending machine.
So if you are going to scale a data centre with thousands of racks, you are going to need a lot of power. With that said, the other thing you are going to need is massive amounts of cooling. 120-130kW racks are far beyond the c. 20 kW limit for air cooling. This isn’t a future problem; it’s a current constraint driving the shift to liquid cooling.
Table 12: Rack Power Density Evolution
Source: Industry Reports
Why this matters for 2026: Power infrastructure and thermal management are becoming gating factors for data centre deployment timelines. The companies that can deliver time-to-power on time, not just equipment, are increasingly valuable.
Timing view: We expect power constraints to remain binding through H1 2027. This arena has the longest lead times (power infrastructure takes 2-7 years to come online, not quarters) and is the hardest to scale quickly. The duration of the constraint supports a longer investment window for well-positioned names.
What we’ll cover this year: We’ll go into further details when we release our “Energise” Investment Memo. We’ll map the power and cooling landscape, identify where capacity is tightest, and highlight the names we think are best positioned.
Conclusion: Energise is the next gate: “megawatts on paper” don’t matter — deliverable power at density does. With multi-year lead times and low coverage, this arena is where mispricings (and asymmetric setups) are most likely to form.
C. Utilise: interconnect determines whether capacity translates to throughput
The third arena is Utilise: can thousands of GPUs behave like one machine?
Where it sits in the causal chain: This is where peak capacity becomes realised throughput i.e., how do we get our GPU clusters work efficiently as one unit. You can ship the chips and power them, but if the fabric can’t coordinate efficiently at frontier scale, you hit the utilisation cliff / latency wall and your theoretical capacity never becomes usable output.
The investment question: Who solves the coordination problem at frontier scale, and can they maintain that position as the bottleneck migrates through the stack?
You can ship the chips. You can power them. But if they can’t communicate efficiently, your expensive cluster underperforms. At frontier scale, the network fabric determines how much of your theoretical capacity becomes usable throughput.
The table below shows the bandwidth tier progression. The key row is 800G — that’s the current deployment wave. The rapid upgrade cycle signals that data movement has become a first-order performance limiter.
Table 13: Interconnect Bandwidth Progression
Source: Industry Reports, Annual Reports, Earnings Calls
That progression is the market admitting that data movement is now a first-order performance limiter. Network inefficiency is a tax on every training run, every checkpoint, every synchronisation event. Fabric quality determines whether your cluster acts like one machine or a thousand separate ones.
Why this matters for 2026: Interconnects are the least talked-about part of the AI infrastructure stack, but it’s where some of the most interesting dynamics are playing out. As clusters scale, the companies solving coordination become increasingly critical.
Timing view: Interconnect constraints are likely to persist but migrate through the stack — from copper and optics today, to switching silicon, to software-defined networking. Unlike memory or power, this isn’t a constraint that “eases” in a simple sense; it evolves. The investment opportunity tracks wherever the bottleneck currently sits.
What we’ll cover this year: We’ll publish our view in our Utilise Investment Memo. We’ll examine the interconnects landscape, optics, silicon, and software, and identify where we see durable competitive advantage.
Conclusion: Utilise is the final gate: it determines whether installed and powered GPUs can operate as one cluster. As clusters scale, bottlenecks migrate through optics, switching, and software and opportunity follows where the utilisation tax is highest.
Summarising the three arenas
Before we share where we see the most opportunity, it’s worth stepping back and comparing the three arenas across the dimensions that matter for investment timing and risk/reward.
Table 14: Arena Comparison
Source: Deep Edge Research analysis
This table summarises the key insight: each arena has a different investment profile. Ship has been our highest-conviction arena through 2025 and will remain important, but the risk/reward is shifting as capacity comes online. Utilise has clear beneficiaries but is well-covered. Energise sits in analytical no-man’s-land, and that’s where mispricing tends to occur.
Where we see the most opportunity
We have exposure in all three arenas and have seen the Memory (Ship) thesis play out very well. We will continue to have significant exposure in that arena since HBM and packaging are severely constrained. However, for 2026, we think Energise is the most underappreciated and has asymmetric upside.
Why Energise? Three reasons:
Coverage gap. Memory (Ship) is well-covered by semiconductor analysts. Interconnect (Utilise) has clear beneficiaries in networking names. But power and thermal infrastructure sits in a no-man’s-land between data centre REITs, industrials, and utilities, which means fewer dedicated technology analysts, less institutional coverage, and more opportunity for mispricing.
Duration of constraint. Power infrastructure has the longest lead times of any arena (2-7 years to bring new capacity online). This isn’t a constraint that eases in quarters; it persists. The duration supports a longer investment window for well-positioned names.
Management language. The constraint is becoming front-page news. When Microsoft’s CEO says the problem is “power, the ability to get builds done fast enough close to power,” and when hyperscalers are signing multi-year power purchase agreements at premium rates, the market hasn’t fully adjusted coverage to match.
Conclusion: we remain exposed across all three, but Energise is the most underappreciated arena for 2026 because the constraint is structural and the market’s coverage is thin. We’ll share our views in the Energise Investment Memo.
The risks we see
We are constructive on AI infrastructure, but intellectually honest investors stress-test their own thesis (as we did in Part 2). The key risk we think deserves more attention is that inference efficiency gains could compress infrastructure intensity faster than expected.
We have already seen the market’s reflex: an efficiency breakthrough gets announced (Flash Attention, MoE routing, quantisation improvements) and investors panic-sell “compute” exposure on the assumption demand will crater.
So far, that has been the wrong reaction. Efficiency has tended to unlock heavier workloads and broader adoption (Jevons Paradox): lower unit cost increases usage, and the system is forced to scale anyway.
But here’s the nuance worth sitting with — and the specific risk we are watching in 2026: what if efficiency gains don’t just redirect spend (as they have done previously); what if they genuinely reduce the compute-per-dollar required for usable AI, or hyperscalers decide to pocket the efficiency as savings?
In that scenario, infrastructure ROI improves (which is good for hyperscaler investors), but throughput vendors see slower unit growth (which pressures multiples).
Conclusion: We don’t think this is the base case: Jevons Paradox has held so far, and demand elasticity appears high. But it’s the risk we’d want to be wrong about early rather than late. If inference efficiency gains start genuinely deflating demand rather than redirecting it, the signposts in Section 4 will break first.
Bull / Base / Bear (2026–2027)
We don’t forecast the world in point estimates. But we do think it’s useful to frame how this supercycle can play out and what each path implies for profit capture across the stack.
Bull case (supercycle accelerates): Capex guides step up again, “capacity build” language persists, and deployment velocity improves at the margin (more power comes online, more balanced systems ship, clusters scale). Implication: the opportunity set keeps widening beyond the obvious layer, with pricing power concentrated in whichever constraint is binding.
Base case (supercycle persists, bottlenecks migrate): Spend stays elevated, some constraints ease (in one layer) but the system remains bottlenecked elsewhere; improvements in throughput are quickly absorbed by demand. Implication: dispersion stays high and leadership rotates — the winners are the constraint solvers, not necessarily the highest-exposure names.
Bear case (intensity compresses): Hyperscalers shift from “capacity build” to “optimise,” deployment timelines slip (time-to-power delays), and efficiency gains are captured as savings rather than reinvested into more workloads. Implication: multiples compress, unit growth slows for throughput vendors, and the trade narrows back toward the most defensible, cash-generative positions.
4) 2026 signposts we will be watching to prove / disprove our thesis
If 2026 is the year AI infrastructure broadens, we expect to see:
Sustained upward revisions to hyperscaler capex and language staying “capacity build” rather than “optimise”
Continued disclosures that compute availability is a pacing item for cloud growth
Further evidence that inference workloads are compounding (token/usage proxies are leading indicators)
Continued pressure on HBM and packaging
Visible escalation in rack-density deployments and rising liquid-cooling penetration
The bandwidth tier progression (400G → 800G → 1.6T) translating into real deployments and order momentum
These are leading indicators because they sit upstream of reported revenue and margin. If these break first, the thesis needs revisiting before the earnings prints confirm it.
If those signals break, we reassess.
What’s next
Over the coming weeks, we’ll publish our theses on who captures the rent across Ship, Energise, and Utilise and why.